About SpecIQ

Built to Fix a Problem Nobody Else Would

Most contractors still build panels on-site. The result is inconsistency, compliance gaps, and hidden costs absorbed quietly by everyone in the chain. We decided to fix it.

SpecIQ shop floor — control panels in production
  • 20+

    Years building control panels

  • 1,500+

    Panels shipped and certified

  • <1%

    DOA rate across all shipments

  • 0

    Secondary inspections required. Ever.

Trusted by teams at

  • Coca-Cola
  • Ford
  • FedEx
  • Amazon
  • JLL
  • Georgia Tech
  • Portman Holdings
  • HSBC
  • Exxon Mobil

Our story

Started on a Job Site. Built in a Factory.

[Founder name] spent [X] years as a [role] before founding SpecIQ. The frustration was always the same: panels built off a bucket, wired differently by every tech, failing inspection. The fix was obvious — build them right, certified, before they leave.

Getting UL 508A as a fully custom shop took years. Most panel makers skip it or only certify a fixed product line. We don't.

Every panel we've shipped has left with a UL label.

The goal was simple — build the panel I always wanted to receive on a job site.

[Founder name] · Founder, SpecIQ · [Replace with real quote]

Founder portrait (4:3)
Shop floor / facility (16:9)

The team

The People Behind Every Panel

When you work with SpecIQ, you work with the same people from consultation to delivery. No sales handoffs, no account managers — your technical contact is with you from drawing review to shipment.

  • [Name]

    [Name]

    Founder & Lead Engineer

    [X] years in building automation. Designed the certification process from the ground up. Still reviews every custom panel spec before production.

  • [Name]

    [Name]

    Head of Production

    Runs the shop floor and oversees every 48-hour burn-in. Has personally tested every panel that's left this building for [X] years.

  • [Name]

    [Name]

    Client Technical Lead

    Your point of contact from first drawing to final shipment. Former [role] — speaks installer, engineer, and facility manager fluently.

Our facility

Built for Certification. Inspected Quarterly.

Our [X,000] sq ft facility in [City] was designed specifically for UL 508A production — controlled component sourcing, standardized wiring bays, and a dedicated burn-in lab where every panel runs for 48 hours before it ships. UL walks through unannounced, four times a year.

How we work

Six Things That Are True of Every Panel We Ship

  • Consistency Across Locations

    Same wiring, same components, same key — whether it's your 1st panel or your 200th. Your custom SKU is locked in forever.

  • No DOA Surprises

    Every panel runs for 48 hours in our burn-in lab before it ships. We find the problems. You don't.

  • Ships UL Certified

    UL 508A on every panel. No secondary inspection on-site. No compliance risk. Code-ready on arrival.

  • Built to Your Exact Spec

    We review your drawings before production begins. What you draw is what gets built. Build-to-spec guarantee, no exceptions.

  • Faster Deployments

    Panels arrive field-ready — hang and wire, done. No specialist needed on-site. No build time lost. No staffing up for panel season.

  • Design Once, Reorder Forever

    Your custom SKU lives in our system permanently. Same quality, zero re-engineering, for every project that follows.

Ready to Stop Field-Building Panels?

Tell us about your project. We'll review your drawings and get back to you within 48 hours.