For Engineers

Spec With Confidence. Build With Certainty.

I spec it one way, and then I walk the job site and it's a completely different panel. Wired wrong, wrong components, no certification.

Questions? Text us: (555) 123-4567

SpecIQ certified control panel matching the engineering spec

Trusted by teams at

  • Coca-Cola
  • Ford
  • FedEx
  • Amazon
  • JLL
  • Georgia Tech
  • Portman Holdings
  • HSBC
  • Exxon Mobil

Did You Know?

Panels built in the field or off-site legally require UL certification — but most aren't certified. SpecIQ panels ship fully certified. No secondary inspection needed. Ever.

Sound Familiar?

  • Shops don't build to spec — wrong wiring, wrong components
  • No UL 508A on field-built panels = compliance risk
  • No source for custom + certified + tested panels
  • Vendors don't understand TIA 568 / IEEE 802.3 requirements

Why Spec Compliance Matters More Than You Think

When an engineer specs a panel one way and the installer builds it another, the liability chain gets murky. By specifying SpecIQ, you create a clean chain of custody: spec → certified build → documented testing → compliant installation. No gaps. No finger-pointing.

How It Works for You

From Spec to Compliant Build in 4 Steps

  1. Send Your Spec

    Share drawings, spec sheets, or describe requirements. We speak TIA 568 and IEEE 802.3.

  2. Technical Review

    Our engineering team reviews every detail before production.

  3. Build to Spec

    UL 508A certified build. Exactly what you drew — verified before shipping.

  4. Spec Us In

    We provide spec language so you can write SpecIQ into future building designs.

What SpecIQ Delivers

  • Build-to-spec guarantee — what you draw is what gets built
  • UL 508A, TIA 568, IEEE 802.3 compliant — no secondary inspection
  • Spec-ready documentation for your building designs
  • Technical team speaks engineering, not sales
  • We provide spec language so you can write SpecIQ into your building spec
  • Quarterly UL facility inspections ensure ongoing compliance

Proof of Performance

Real Results

Newcomb & Boyd specified SpecIQ across three commercial projects after years of finding panels on site that didn't match their drawings. The result — 100% spec compliance and zero secondary inspections across every project.

For the first time, the panels on site actually matched what I drew. I spec SpecIQ on every project now.

MEP Engineer, Newcomb & Boyd

Newcomb & Boyd

Field-Built vs. SpecIQ

Criteria
Field-Built
SpecIQ
Spec Compliance
Varies widely
Build-to-spec guarantee
UL 508A
Rarely certified
Facility inspected quarterly
Documentation
Minimal
Full package
TIA 568 / IEEE 802.3
Often unknown
Native compliance
Secondary Inspection
Required
Never needed
Build Quality
Depends on shop
48-hr burn-in tested

FAQ

Questions We Hear All the Time

Yes. Build-to-spec is our guarantee. Every panel starts with a technical review of your drawings. You approve the design before production begins.
Absolutely — and we'll help. We provide ready-to-use spec language you can drop directly into your building design documents.
SpecIQ is the only shop doing custom building automation panels with UL 508A certification, 48-hour burn-in testing, and spec-code compliance (TIA 568, IEEE 802.3).
Full documentation package: as-built drawings, UL 508A certification, bill of materials, wiring diagrams, and test reports.

The Spec Compliance Problem

What You Draw Should Be What Gets Built. It Usually Isn't.

When a field-built panel doesn't match your spec, the liability chain breaks. With SpecIQ, we build exactly what you drew — certified, documented, and verified before it ships.

  • Build-to-Spec Guarantee

    Your drawings reviewed by our engineering team before production. You approve the SKU. What you drew is what ships.

  • Clean Liability Chain

    Spec to certified build to documented testing to compliant install. No gaps. No finger-pointing when something is questioned on site.

  • TIA 568 and IEEE 802.3 Native

    We speak your language. Cabling and protocol standards are built in from day one — not retrofitted after the fact.

  • UL 508A on Every Panel

    Ships certified. No secondary inspection on-site. Your inspector sees the label and moves on.

  • Full Documentation Package

    As-builts, cert docs, BOM, wiring diagrams, test reports. Everything you need for your project file, included.

  • Write Us Into Your Spec

    We provide ready-to-use spec language you can drop directly into your building design documents for future projects.

Ready to Spec With Confidence?

Send us your drawings. We'll review, confirm compatibility, and respond within 48 hours. A technical review — not a sales call.